Zum Inhalt springen Zum Navigationsmenü springen

Lamellensatz, Pfeiffer DUO 250A/255M

PVK025
806,00  EUR
Benutzen mit Pfeiffer DUO 250A,DUO 255M (Index C),DUO 120A

Einzelheiten zum vollständigen Inhalt des Kits finden Sie in der nachstehenden Materialliste
Artikelnummer Beschreibung Menge Menge auf lager
230094 Lamelle,Stg 1,GX,UNO250,DUO250/255 2 5
230095 Lamelle,Stg 2,GX 2 8
490075 Schieberfeder,DUO 250A/255M 4 14

Allgemeine Produktklassifizierungen

Alternative Produktnummer PKE08028-T
Kompatible Marken Pfeiffer
Produktgruppe DUO
Pumpenmodelle DUO250A
DUO255M(IndexC)
DUO120A
Kategorie Reparatursätze
Unterkategorie Schieberkits
Ursprungsland US

Pfeiffer - Oil Sealed, Two Stage Rotary Vane Pumps

  • DUO 120A – standard version
  • DUO 125 (Index B) – standard version
  • DUO 125M – magnetic coupling
  • UNO/DUO 250A – standard version
  • DUO 255M (Index C)  – magnetic coupling

* MC version – Corrosive gas application (with magnetic coupling)

Oil Change:

The maintenance schedule of operating fluid depends on application and location of pump. The oil must be changed if:

  • Ultimate pressure is no longer attainable
  • Oil appears contaminated, milky, or cloudy when viewed through sight glass
  • Oil is discolored

Oil Capacity:

  • DUO 120 - 13 liter
  • DUO 125 - 14 liter
  • UNO 250 - 30 liter
  • DUO 250 - 23 liter
  • DUO 255 - 25 liter

Maintenance Intervals:

Daily:

  • Check operating fluid levels
  • Check for leaks

As required (at least annually):

  • Change operating fluid
  • Disassemble casing, sight glass and pumping system and clean casing outside (without cleaning agent)
  • Clean gas ballast valve & silencer
  • Clean motor fan cap

As required (at least every 2 years):

  • Disassemble the pump, clean & exchange seal and wearing parts

As required (at least every 4 years):

  • Carry out work in accordance with maintenance and additionally
    • Change vanes
    • Change valves, springs, and sight glass
    • Change silencer nozzle
    • Check coupling and exchange is necessary